A twin track electrification solution designed to reduce infrastructure cost, programme time, and delivery risk when applied early in the design process.
Download the TTC FlyerElectrification programmes continue to face intense pressure to deliver more route miles at lower cost. While progress has been made, cost, access constraints, and programme disruption remain major barriers to scalable delivery.
One of the most significant cost drivers in both construction and long-term maintenance is track possession. Rising passenger numbers and increasingly constrained access windows reduce the time available to work on live rail infrastructure, increasing programme risk and overall cost.
Addressing these constraints requires solutions that reduce on-track time, simplify installation, and support more efficient delivery, without compromising performance or safety.
Faster to assemble and install
Reduced on-site assembly supports quicker installation within limited possession windows.
Easily adjustable for maintenance
Adjustments can be made without full component replacement.
Fewer tools required
Simplified installation reduces tooling needs on site.
Corrosion-resistant materials throughout
Selected to support long-term durability in exposed rail environments.
Fewer points of failure
Simplified design using just 11 components.
Factory-controlled quality and traceability
Manufactured under controlled conditions to ensure consistent quality and traceability.
Less time working at height
Design minimises work at height during installation and maintenance.
Lighter product for linesmen
Optimised component weight supports safer handling.
Reduced visual impact
Lower profile structure helps minimise visual intrusion along the route.