+44 (0)1285 323 525 contact@pace-networks.com Contact Us
Rail Stock

Rail Infrastructure Stock Solutions and Assembly Refurbishment

At PACE Networks, we understand the vital role of stock management in rail electrification projects. Our extensive stockholding ensures that critical components like cantilever assemblies, specialised fittings, and insulators are available to meet project timelines, even under last-minute changes or urgent demands.

We provide rapid, on-demand deliveries for both planned installations and emergency needs, ensuring you have the materials exactly when you need them.

Learn more
Rail stock management

Rail stock

PACE Networks are your trusted UK stockists for Rail, providing essential parts to the industry available for immediate delivery.

We have significantly expanded our UK stock and distribution operation to provide a comprehensive range of Bonomi’s Omnia cantilevers, now available as sub-assemblies. With cantilever stocks typically exceeding 1000 units, our commitment to working with clients on forecasting and high stock levels supports your project’s success. With no minimum order quantities on most products, rapid and flexible delivery options, PACE help you deal with challenges like last minute design changes. By stocking products based on historical trends and including hard-to-find items, we offer flexibility to meet your specific project requirements.

Cantilever assemblies

CANTILEVER ASSEMBLIES

The complete Omnia range, including stock at sub-assembly level. This includes Omnia cantilevers and neutral sections, as well as underbridge arms.

Insulators

Insulators & Bridge Arms

Including strut insulators, underbridge arms and ATF insulators.

Droppers

DROPPERS (ADJUSTABLE AND FLEXIBLE)

The new Bonomi dropper clamp and adjustable droppers.

Clamps

CLAMPS (PG AND EARTH CLAMPS)

Full range of PG clamps, mast clamps, earth clamps, contact wire clamps, catenary wire supports and contact wire clamps.

Isolators

Isolators

A range of isolators designed for safe and reliable electrical isolation in rail.

OLE measurement tools

OLE MEASUREMENT TOOLS

Including height and stagger gauges, laser tools for contact wire wear and live line precision measurement.

Request to receive current rail stocklist

    This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

    ASSEMBLY AND REFURBISHMENT

    • 500 Rail Cantilevers can be assembled a month with high levels of accuracy and quality control, batch tracked and location labelling if required
    • A wide range of items can be collected from site and refurbished to a high standard, providing sustainability within the customers stock profile
    Experts in rail stocking

    CONTACT US FOR A QUOTE

    Please contact team by email info@pace-networks.co.uk, phone +44 (0)1285 323 525 or using the online form here. You should expect to receive a quotation back within 2 working days (usually within 1).

    If you can please include any information regarding technical specifications and required dates, the team will quote accordingly.

    CONTACT PACE NETWORKS FOR A QUOTE

    Solutions for Rail and Power Grid

    Connecting What Powers Tomorrow