Connecting Technologies
T: +44 (0)1285 323 525    E: contact@pace-networks.com

Back to all News »

Mle’s 27m Demonstration Rig with Pear-drive Assembly

Morris Line Engineering are offering customers the chance to view a 27 metre installation of their pear-drive operating tube assembly at their factory in Bridgend. The installation demonstrates the simplicity of the design and its very impressive reach, as well give engineers a chance to get their hands on the product. It’s a busy time for Morris Line right now, with orders to Crossrail and Shenfield -Southend-Victoria, as well as product developments and new qualified installer training courses.

Contact PACE today to arrange a viewing of this impressive demonstration setup >

Get the Latest Rail & Power Grid Updates Direct to Your Inbox:

You might also be interested in reading...

Matt Kiely-Smith Joins PACE Networks Rail Team

PACE Networks’ offering to Electrified Railways grew in 2023, and in line with this, we increased the team servicing that market with the addition of Sales Engineer Matt Kiely-Smith.
Read More >

Contact Wire Measurement on Rigid Catenary – Network Rail Approved

Hastec Rail gained another Network Rail approval for their range of state-of-the-art surveying equipment, their Con-Tec Beam. Contact PACE Networks today to discuss a demonstration or trial of the Con-Tec or Con-Tec Beam.
Read More >

New Products in PACE Networks Stocks

PACE Networks began stocking and distributing rail electrification products in 2018 and is constantly reviewing the range of components and sub-systems held in our warehouse.
Read More >

 
RIQS
RIA
ISO 9001
Achilles
Cyber Essentials