Connecting Technologies
T: +44 (0)1285 323 525    E: contact@pace-networks.com

Back to all News »

Northwest Sparks – Phase 4 Manchester to Preston

As part of the £1bn+ Great North Rail Project investment, the railway between Manchester and Preston via Bolton will be upgraded to allow for faster, greener, quieter and more reliable journeys from December 2017.Once again, PACE managed the project, under different contractors, to facilitate the fitting of Cantilevers, Fittings, Droppers, and Switches.

View more Case Studies

Get the Latest Rail & Power Grid Updates Direct to Your Inbox:

You might also be interested in reading...

Matt Kiely-Smith Joins PACE Networks Rail Team

PACE Networks’ offering to Electrified Railways grew in 2023, and in line with this, we increased the team servicing that market with the addition of Sales Engineer Matt Kiely-Smith.
Read More >

Contact Wire Measurement on Rigid Catenary – Network Rail Approved

Hastec Rail gained another Network Rail approval for their range of state-of-the-art surveying equipment, their Con-Tec Beam. Contact PACE Networks today to discuss a demonstration or trial of the Con-Tec or Con-Tec Beam.
Read More >

New Products in PACE Networks Stocks

PACE Networks began stocking and distributing rail electrification products in 2018 and is constantly reviewing the range of components and sub-systems held in our warehouse.
Read More >

 
RIQS
RIA
ISO 9001
Achilles
Cyber Essentials